Zone 12: internal streets paved

Asphalt is down on every internal street of zone 12. Kerbs, lighting and the green strips come next.

Completed60%

The 12 m internal streets of zone 12 now have their asphalt layer.

Done so far:

  • base layers and drainage
  • asphalt on every internal street

Next:

  1. kerbs and pavements
  2. street lighting
  3. the green strips between the units

See the zone on the master plan.